检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:朱明[1] Zhu Ming
机构地区:[1]中铁二院工程集团有限责任公司,成都610031
出 处:《铁道通信信号》2022年第6期30-33,共4页Railway Signalling & Communication
基 金:中铁二院工程集团有限责任公司科研课题(KYY2019042(19-21))。
摘 要:对于桥隧占比高的高速铁路线路,为合理利用构筑物内的钢筋结构,减少维护工作量,降低投资,通过理解和分析现行防雷接地技术规范及相关通用图册,提出在隧道及部分桥梁地段,利用电缆槽内纵向接地钢筋取代贯通地线的综合接地方案,并对该方案的工程可实施性进行了研究与分析。Based on the understanding and analysis of current technical specifications of lightning protection and grounding and relevant all-purpose book of drawings,an integrated grounding solution is proposed for high-speed railway with high proportion of bridge and tunnel,in which the longitudinal grounding reinforcement in the cable trench replaces the through ground wire in the tunnel and some bridge sections in order to make rational utiliztion of the reinforcement construct in the structure and reduce the maintenance workload and the cost.In the end,the feasibility of the project is studied and analyzed.
关 键 词:高速铁路 桥隧占比 综合接地 贯通地线 防雷接地 纵向接地钢筋
分 类 号:U284.91[交通运输工程—交通信息工程及控制]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15