检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:孙钰林 刘凤洋 武斌斌 杨宇宁 杨春鹏 赵锐[1] 高峰[1] SUN Yulin;LIU Fengyang;WU Binbin;YANG Yuning;YANG Chunpeng;ZHAO Rui;GAO Feng(SINOPEC Research Institute of Petroleum Processing,Beijing 100083,China;Chemical Branch of Zhongtianhechuang Energy Co.,Ltd.,Ordos 017399,China)
机构地区:[1]中国石化石油化工科学研究院,北京100083 [2]中天合创能源有限责任公司化工分公司,内蒙古鄂尔多斯017399
出 处:《工业水处理》2022年第7期192-198,共7页Industrial Water Treatment
基 金:中国石油化工股份有限公司资助项目(321004)。
摘 要:煤化工废水作为难处理高污染工业废水,其末端双膜深度处理系统常存在运行负荷高、双膜反洗频繁、运行成本高等共性问题。对鄂尔多斯某煤化工企业废水处理系统进行研究,发现其在高密澄清池除硬药剂加药量、工艺流程等方面存在问题,同时保安过滤器存在严重的有机污染。对此,首先根据煤化工废水末端“负硬度”水质的特点,降低碳酸钠加入量,提升氧化钙用量,以降低高密澄清池出水碱度;另外洗膜废水作为小水量高污染废水流股应该从废水处理系统切出并输送至前端生化处理单元,高密池出水回调pH位点由现行工艺流程中置于V型滤池之前改为置于V型滤池之后;同时优化非氧化性杀菌剂投加量以抑制微生物滋生进而改善保安过滤器污堵问题。通过工艺流程优化解决了典型的运行问题,显著降低了运行成本,提升了处理效果。Coal chemical wastewater is a kind of high polluted and hard treated industrial wastewater,whose terminal treatment system has common issues of high operating load,frequent membrane backwash and high operation cost.The result in a coal chemical sewage treatment system in Ordos indicated that both medicaments dosage and the treatment process had severe problems.In addition,there were serious organic pollution problems in security filters.Firstly,based on the negative hardness characteristics of coal chemical terminal wastewater,research results showed that reducing sodium carbonate dosage and increasing the amount of calcium oxide could reduce effluent al⁃kalinity from the high-density clarification tank.Then,considering the small amount of membrane washing wastewater was heavily polluted,it was better to transfer it from present treatment system to the biochemical treatment unit.The pH adjustment site of high-density filter effluent was changed from before the V-type filter to after the V-type filter.Lastly,microbial breeding should be inhibited by improving non-oxidative fungicides to improve the fouling of security filter.By processing optimization,these typical operation problems could be solved.Furthermore,the opera⁃tion cost was reduced distinctly and treatment effect was improved.
分 类 号:X703[环境科学与工程—环境工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.15.149.213