摘  要:水轮发电机组因水力学原因,在额定水头无法达到额定出力时会降低水资源利用效率、影响机组稳定运行。本文通过对影响机组出力的流量、水头损失等因素进行分析,查找可能存在的水头损失的部位,为水电机组额定水头时无法达到额定出力问题提供了分析途径。Due to hydraulic reasons,the failure of hydro-generator units to reach rated output at the rated head will reduce utilization efficiency of water resources and affect the stability of operation of the unit.By analyzing the factors such as flow and head loss that affect the output of the units,this paper finds out some possible positions of head loss,and provides an analysis for the problem that rated output of the hydropower unit cannot be reached at the rated head.

关 键 词:水电机组 出力不足 额定水头 额定出力 

分 类 号:TM612[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象