检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:林晓明 唐建林 张帆 罗欣儿 田杰 肖勇 LIN Xiaoming;TANG Jianlin;ZHANG Fan;LUO Xiner;TIAN Jie;XIAO Yong(Electric Power Research Institute,CSG,Guangzhou 510670,China;Guangdong Provincial Key Laboratory ofIntelligent Measurement and Advanced Metering of Power Grid,Guangzhou 510670,China;Shenzhen Power Supply Bureau Co.,Ltd.,Shenzhen 518001,China)
机构地区:[1]南方电网科学研究院,广东广州510670 [2]广东省电网智能量测与先进计量企业重点实验室,广东广州510670 [3]深圳供电局,广东深圳518001
出 处:《电力系统保护与控制》2022年第13期143-150,共8页Power System Protection and Control
基 金:国家重点研发计划项目资助(2019YFE0118700);贵州省科技计划项目(黔科合支撑[2022]一般015);深圳供电局科技项目资助(090000KK52190043)。
摘 要:为解决大规模电动汽车单向充电造成的电网冲击和线路负荷过重问题,开展了电动汽车V2G技术在多能互补系统中的应用研究。首先,对比分析了多种典型的多能互补系统拓扑结构的技术优缺点,在基于共交流母线的多能互补系统中应用V2G技术。其次,提出基于虚拟同步机的V2G自主有功-无功控制策略,优化设计虚拟惯量、阻尼系数等关键参数,模拟传统发电机组的机电暂态特性,实现系统自主调压调频,解决光伏发电的间歇性和随机性带来的电网指标波动问题。然后,搭建了典型的多能互补系统,并进行仿真验证。结果表明,基于虚拟同步机的V2G设备能主动跟踪并网点频率、电压变化,及时提供有功、无功功率支撑,有效保障电网运行的稳定性。最后,研制了基于虚拟同步策略的500 kW大功率V2G设备,并在示范项目中成功应用,验证了所提方法的有效性。There are problems of power grid impact and line overload caused by one-way charging of electric vehicles on a large scale.Thus research and application of electric vehicle V2G technology in a multi-energy system are carried out.First,the technical advantages and disadvantages of several typical multi-energy system topologies are compared,and V2G technology is adopted in a multi-energy system based on a common AC bus.Secondly,an autonomous active and reactive power control strategy for V2G based on a virtual synchronous machine is proposed to optimally design key parameters such as virtual inertia,damping,etc.,simulate the electromechanical transient characteristics of traditional generator sets,realize the independent voltage and frequency regulation,and solve the problem of grid index fluctuation caused by the intermittent nature and randomness of photovoltaic power generation.Thirdly,a typical multi-energy system is established for simulation,and results show that the V2G equipment based on a virtual synchronous machine can actively track the changes of frequency and voltage at the connection point,and provide active or reactive power support in time.This effectively ensures the stability of power grid operation.Finally,a 500 kW high-power V2G equipment based on the virtual synchronization strategy is developed and successfully applied in the demonstration project,verifying the effectiveness of the proposed method.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28