检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:蒋爽 Jiang Shuang(CASCO Signal Ltd.,Beijing 100070,China)
出 处:《铁路通信信号工程技术》2022年第7期13-17,共5页Railway Signalling & Communication Engineering
基 金:国家重点研发计划项目(2018YFB1201500)。
摘 要:资源管理系统(RMU)的逻辑处理子系统(BOOL)部分相当于既有车站联锁,由于RMU的系统本身的需求及系统接口原因,BOOL子系统的相关功能的设计及实现方式又跟既有联锁有着很大差别,结合既有车站联锁的相关功能,对比分析BOOL子系统的进路办理、解锁和区间改方逻辑,对BOOL子系统的特殊需求进行详细分析及说明。The logic processing subsystem(BOOL)of resource management system(RMU)is equivalent to the existing station interlocking.Because of the requirements of RMU's system itself and system interface,the design and implementation of related functions of BOOL subsystem are quite diff erent from those of the existing interlocking.Based on the related functions of existing station interlocking,this paper compares and analyzes the logic of route setting and release as well as the logic of changing section direction in BOOL subsystem,and explains in detail the special requirements of BOOL subsystem.
关 键 词:新型列控系统 资源管理系统 BOOL子系统 特殊联锁功能
分 类 号:U284.48[交通运输工程—交通信息工程及控制]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49