检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:吴军贵 王彩虹 周夏汀 WU Jungui;WANG Caihong;ZHOU Xiating
机构地区:[1]杭州市燃气集团有限公司,浙江杭州310017 [2]浙江理工大学,浙江杭州311018 [3]浙江城建煤气热电设计院,浙江杭州310030
出 处:《煤气与热力》2022年第7期I0006-I0010,共5页Gas & Heat
摘 要:提出一种利用LNG真空罐压力给LNG槽车增压的BOG卸车工艺,给出计算BOG卸车工艺卸液时间的方法,对传统卸车工艺与BOG卸车工艺进行分析比较。BOG卸车工艺单车卸车用时大幅缩短,卸车效率提高了48.9%。BOG卸车工艺受环境温度影响小,可省略卸车增压器。BOG卸车工艺槽车储罐压力控制更稳定,员工操作简单,卸车风险低。按每年卸500车计算,应用BOG卸车工艺,每年节约操作人工费用约10×10^(4)元/a,节约电费64500元/a。BOG卸车工艺节省卸车时间,提升LNG厂站运行效率,减少卸车橇占地面积,降低投资。A BOG unloading process using LNG vacuum tank pressure to pressurize LNG tank truck is proposed.The method for calculating the unloading time of BOG unloading process is given.The traditional unloading process and BOG unloading process are analyzed and compared.The BOG unloading process greatly shortens the time for single tank truck unloading,and the unloading efficiency is increased by 48.9%.The BOG unloading process is less affected by ambient temperature,and the unloading booster can be omitted.The BOG unloading process has more stable tank pressure control,simple operation and low unloading risk.Based on the annual unloading of 500 tank trucks,the BOG unloading process can save about 10×10^(4) yuan/a in labor cost and 64500 yuan/a in electricity cost.The BOG unloading process can save unloading time,improve the operation efficiency of LNG plant and station,reduce the floor area of unloading skid and reduce investment.
关 键 词:BOG卸车工艺 传统卸车工艺 自增压器 卸净率 LNG真空罐
分 类 号:TE821[石油与天然气工程—油气储运工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.144.251.83