检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:邢国荣[1] 瞿旭龙 陈秋香 刘进松 田晓彤 XING Guo-rong;QU Xu-long;CHEN Qiu-xiang;LIU Jin-song;TIAN Xiao-tong(Beijing Construction Engineering Group,100055,Beijing,China)
出 处:《建筑技术》2022年第7期825-829,共5页Architecture Technology
摘 要:储存环隧道是整个大科学装置的核心部分,因其特殊的功能性大大增加了施工难度。测量功能的无干扰准直桩、纳米级防微振功能的地基处理,以及防辐射功能的重晶石锯齿墙、辐射核心区钢板墙、辐射薄弱点的细部构造和预应力施工等,成为储存环隧道施工攻破的重点,也是整个高能同步辐射光源科学装置的重中之重。Storage ring tunnel is the core of the whole big scientific device,its special function increases the construction difficulties.The important points in storage ring tunnel construction include non-interference quasi-vertical pile of measurement function,foundation treatment of nanometer microvibration prevention function,detail structure and prestress construction of radiation prevention function barite ratchet wall,steel wall at radiation core and radiation week point,etc.These are also the most important parts in the whole high energy photon source scientific device.
分 类 号:TU753[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.15.7.20