检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:袁梦召 Yuan Meng-zhao
机构地区:[1]中铁二十二局集团第四工程有限公司,天津301700
出 处:《建筑技术开发》2022年第12期146-148,共3页Building Technology Development
摘 要:通过拆卸DF900D型架桥机的前端主梁,增加导梁地面驮行装置,以实现架桥机在下穿既有公路(高度和距离都不满足)的特殊工况下完成架梁作业的施工方法,总结此型号架梁设备在通过类似工况下的施工经验,针对施工过程中的关键项目控制点进行分析,制订有效的管控措施,为以后类似工况施工提供借鉴。This paper introduces the construction method of the bridge erecting machine under the special working condition that the height and distance of the bridge erecting machine under the existing highway are not satisfied by dismantling the front end main beam of the DF900D bridge erecting machine and adding the guiding beam ground dragging device, this paper summarizes the construction experience of this type of beam erection equipment under similar working conditions, analyzes the key project control points in the construction process, and formulates effective control measures, so as to provide reference for the construction of similar working conditions in the future.
关 键 词:DF900D型架桥机 拆卸 主梁 导梁驮行装置
分 类 号:U445.4[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.195