检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:周建平[1] 杜效鹄[2,3] 周兴波 ZHOU Jianping;DU Xiaohu;ZHOU Xingbo(POWERCHINA Limited,Beijing 100048;China Renewable Energy Engineering Institute,Beijing 100120;Research and Development Center of National Energy and Hydropower Engineering Technology,NEA,Beijing 100120)
机构地区:[1]中国电力建设股份有限公司,北京100048 [2]水电水利规划设计总院,北京100120 [3]国家能源水电工程技术研发中心,北京100120
出 处:《水力发电学报》2022年第7期106-115,共10页Journal of Hydroelectric Engineering
基 金:中国工程院战略研究与咨询项目(2021-XBZD-13-19);中国电建集团科技项目(DJ-KJGL-2021-01)。
摘 要:践行双碳战略,能源是主战场,电力是主力军,构建以新能源为主体的新型电力系统是实现碳中和的必由之路。在分析碳中和背景下电力行业减排目标、电力结构及其占比的基础上,针对构建新型电力系统面临的问题与挑战,提出加快常规水电和抽水蓄能电站建设是新型电力系统可靠性和长周期调节能力的重要基础。结合我国能源资源禀赋和开发利用现状,提出强化水电与新能源协同发展战略思路,依托流域梯级水电建设更大规模清洁能源基地,并加快抽水蓄能电站和储能工厂建设的发展路径,重新定义了水电在新型电力系统中既提供基础电量又发挥容量功能的新定位,进而提出促进清洁能源大基地和储能工厂建设的政策建议。研究成果可为清洁能源基地规划设计和相关政策文件的编制与修订提供一定参考。To implement the dual-carbon strategy,energy is the main battlefield and electricity the main force;developing a new power system with new energy resources as the main body is the only feasible path to achieving carbon neutrality.This paper examines the emission reduction targets,electricity composition,and structure of the power industry under the dual-carbon strategy,and demonstrates that accelerating the construction of conventional hydropower stations and pumped storage power stations is an important basis for solving problems and challenges such as the reliability and long-term regulation capabilities of the new system.Based on the hydropower resources endowment and the development status,we present a strategic idea of strengthening the coordinated development of hydroelectric power and new energy,and redefine the development path of building clean energy bases and energy storage plants and accelerating the construction of pumped-storage power stations and cascaded conventional hydropower reservoirs.This new positioning of hydroelectric power in the new system not only provides basic electricity but plays its capacity function.Thus,we suggest certain policy should be formulated to speed up the construction of clean energy bases and energy storage plants.Our findings could help the revision and compilation of the planning schemes and regulations.
关 键 词:碳中和 常规水电 抽水蓄能 新型电力系统 清洁能源基地 储能工厂
分 类 号:TV698.237[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7