揭西县塔头拦河闸重建工程消能试验研究  被引量:4

Experimental Study on Energy Dissipation of Reconstruction Project of Tatou Sluice in Jiexi County

在线阅读下载全文

作  者:钟勇明[1] 付波[1] 黄智敏[1] ZHONG Yongming;FU Bo;HUANG Zhimin(Guangdong Research Institute of Water Resources and Hydropower,Guangzhou 510635,China)

机构地区:[1]广东省水利水电科学研究院,广州510635

出  处:《广东水利水电》2022年第7期28-32,共5页Guangdong Water Resources and Hydropower

摘  要:通过揭西县塔头拦河闸重建工程水工断面模型试验研究,结合工程布置和闸址河道地形等因素,采取在消力池内设置消力墩、降低消力池池底及尾坎顶高程等措施,妥善解决了拦河闸上、下游水流消能衔接过渡问题。试验研究成果可为工程设计提供科学依据。Through Jiexi County Tower Tower River Gate Rebuilding Project Hydraulic section model test,combined with engineering arrangement and gathered river terrain,it is taken to set up a replenishment pier in the dummy pool,reducing the resilial pool bottom and the tail-king elevation elevation.Waiting for measures to properly solve the problem of transition to the river gate and downstream water flow.Test research results can provide scientific basis for engineering design.

关 键 词:拦河闸 消力池 消能 试验研究 

分 类 号:TV653+.1[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象