检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:钟勇明[1] 付波[1] 黄智敏[1] ZHONG Yongming;FU Bo;HUANG Zhimin(Guangdong Research Institute of Water Resources and Hydropower,Guangzhou 510635,China)
出 处:《广东水利水电》2022年第7期28-32,共5页Guangdong Water Resources and Hydropower
摘 要:通过揭西县塔头拦河闸重建工程水工断面模型试验研究,结合工程布置和闸址河道地形等因素,采取在消力池内设置消力墩、降低消力池池底及尾坎顶高程等措施,妥善解决了拦河闸上、下游水流消能衔接过渡问题。试验研究成果可为工程设计提供科学依据。Through Jiexi County Tower Tower River Gate Rebuilding Project Hydraulic section model test,combined with engineering arrangement and gathered river terrain,it is taken to set up a replenishment pier in the dummy pool,reducing the resilial pool bottom and the tail-king elevation elevation.Waiting for measures to properly solve the problem of transition to the river gate and downstream water flow.Test research results can provide scientific basis for engineering design.
分 类 号:TV653+.1[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.188.152.124