检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李航 阚思蒙 李茂杉 宿科 LI Hang;KAN Simeng;LI Maoshan;SU Ke(Lawa Branch of Huadian Jinsha River Upstream Hydropower Development Co.,LTD,Chengdu,Sichuan,610041)
机构地区:[1]华电金沙江上游水电开发有限公司拉哇分公司,四川成都610041
出 处:《四川水力发电》2022年第3期12-14,17,共4页Sichuan Hydropower
摘 要:随着科学技术的发展,逆向工程被广泛运用于工业设计中。逆向工程技术具有有效缩短产品设计、开发周期,降低新产品开发成本的优点。本文以一专用于大变幅水头条件下的混流式水轮机转轮为研究对象,探索研究混流转轮逆向建模过程中的重点与难点,最后通过水轮机全流道数值模拟验证了转轮逆向结果的可靠性,为混流式水轮机逆向工程持续深入的研究工作提供参考。With the development of science and technology,reverse engineering is widely used in industrial design.Reverse engineering technology has the advantages of effectively shortening product design and development cycle and reducing the development cost of new product.In this paper,a Francis turbine runner specially designed for the operating condition of large variable water head is taken as the research object,and the key points and difficulties in the reverse modeling process of the Francis runner are explored and studied.Finally,the reliability of the research result is verified by numerical simulation of the turbine with full flow passage,which provides a reference for the continuous and in-depth research of reverse engineering of the Francis turbine.
分 类 号:N945[自然科学总论—系统科学] TK733.1[交通运输工程—轮机工程] N945.12[动力工程及工程热物理—流体机械及工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.145.83.240