检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张彬[1] ZHANG Bin(Sinohydro Bureau 5 Co.,LTD,Chengdu,Sichuan,610066)
机构地区:[1]中国水利水电第五工程局有限公司,四川成都610066
出 处:《四川水力发电》2022年第3期83-88,共6页Sichuan Hydropower
摘 要:随着我国土木工程机械化作业水平的不断提高,机械开挖使用率也大幅度提高,尤其是在隧洞开挖方面,由于掘进机对围岩的扰动小从而大大提高了生产安全性,同时减少了爆破造成的超挖超支护问题。但隧洞施工在机械开挖的同时也受到地质情况、工程结构等限制,出现功效不高,成本较大的问题。以小断面水工隧洞机械开挖为例,介绍了对适应洞型及地质情况的设备选择、施工方法、功效分析及其适应性分析,可供类似工程借鉴。With continuous promotion of mechanization in civil engineering in China,the utilization of mechanical excavation has increased significantly,especially in tunnel excavation,which greatly improves construction safety owing to small disturbance from the road header to the surrounding rock,reduces over-excavation and over-support caused by blasting.However,the mechanical excavation of tunnels is also restricted by geological conditions and engineering structures,which causes problems such as low efficiency and high cost.Taking the mechanical excavation of a small-section hydraulic tunnel as an example,this paper introduces the selection of equipment,construction methods,efficiency analysis and adaptability analysis that adapt to the tunnel type and the geological condition,and provides a reference for similar projects.
关 键 词:水工隧洞 机械铣挖 施工技术 适应性分析 黄沙水库灌区
分 类 号:TV7[水利工程—水利水电工程] TV52TV554
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229