作 者:乔小龙[1] QIAO Xiaolong(Sinohydro Bureau 5 Co.,LTD,Chengdu,Sichuan,610066)
机构地区:[1]中国水利水电第五工程局有限公司,四川成都610066
出 处:《四川水力发电》2022年第3期133-136,共4页Sichuan Hydropower
摘 要:以解决巴塘水电站左岸高边坡预应力锚索成孔慢问题为导向,阐述了对固壁灌浆液快凝配合比缩减预应力锚索成孔时间进行的研究,在施工现场对减水剂、速凝剂、早强剂、膨胀剂进行了固壁灌浆液快凝配合比试验,得出掺加减水剂和速凝剂等固壁灌浆液可以明显降低固壁灌浆液的凝结时间的结论并付诸实施,提高了成孔率,减少了成孔时间,加快了预应力锚索支护的施工进度。Aiming at solving the problem of slow hole-formation of pre-stressed anchor cable on the high slope of the left bank of Batang Hydropower Station,this paper expounds the research on shortening hole-formation time of pre-stressed anchor cable through adjusting mix ratio of fast setting consolidation grout.Fast-setting mixing ratio test of the consolidation grouting liquid is carried out on water-reducing admixture,accelerator,early-strengthen and expansion agent at the construction site.The test shows that by adding such admixtures as accelerator and early-strength agent,etc.,setting time of consolidation grout can be significantly reduced.This application is proven to improve hole-formation rate,reduce hole-formation time and accelerate the construction progress of pre-stressed anchor cable.
关 键 词:高边坡 预应力锚索 固壁灌浆液配合比 巴塘水电站 试验及应用
分 类 号:TV7[水利工程—水利水电工程] TV52TV543TV42
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117