检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王乾 Wang Qian(Shandong Gold Group Penglai Mining Co.,Ltd.,Yantai Shandong 265621)
机构地区:[1]山东黄金集团蓬莱矿业有限公司,山东烟台265621
出 处:《现代工业经济和信息化》2022年第6期305-306,311,共3页Modern Industrial Economy and Informationization
摘 要:盲竖井施工主要分为吊桶提升、出渣和竖井提升装置安装、施工通风等系统,在施工过程中存在较大多工序交叉作业,具有施工难度大、施工周期长、施工风险大的特点。以蓬莱矿业有限公司某盲竖井施工工艺为例,介绍了盲竖井建井施工安全技术重点注意事项。Blind shaft construction is mainly divided into bucket lifting,slag discharge and shaft lifting device installation,construction ventilation and other systems.There are large multi-process cross operations during the construction process,which has the characteristics of high construction difficulty,long construction period and high construction risk.Taking the construction technology of a blind shaft in Penglai Mining Co.,Ltd.as an example,this article introduces the key precautions of the blind shaft construction safety technology.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.19.28.64