检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈浩南 李百利 CHEN Hao-nan;LI Bai-li(China Nuclear Power Engineering Co.,Ltd.)
机构地区:[1]中国核电工程有限公司,100840
出 处:《建筑热能通风空调》2022年第5期78-81,70,共5页Building Energy & Environment
摘 要:本文以核电站的电气间通风设计为例,介绍了核电站电气间的设计原则,并结合了项目地点的气象参数条件,进行了全新风(新风未冷却处理)、室外新风蒸发冷却、室外新风加室内风循环冷却三种方案的数值模拟计算。结果表明,室外新风加室内风循环冷却方案相比全新风(新风未冷却处理)方案,风量减少51%,相比外新风蒸发冷却方案,未造成空调冷负荷的浪费,且可满足房间温度要求。Taking the ventilation design of the electrical room of a nuclear power plant as an example, the design principles of the electrical room of the nuclear power plant are introduced, and the numerical values of three schemes of fresh air(fresh air without cooling), outdoor fresh air evaporative cooling, and outdoor fresh air heating and indoor air circulation cooling are carried out in combination with the meteorological parameters of the project site. Compared with the fresh air(fresh air without cooling) scheme, the outdoor fresh air plus indoor air circulation cooling scheme reduces the air volume by 51%. Compared with the outdoor fresh air evaporative cooling scheme, it will not cause waste of air-conditioning cooling load and can meet the room temperature requirements.
分 类 号:TM623[电气工程—电力系统及自动化] TU834[建筑科学—供热、供燃气、通风及空调工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.173