检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:白香杰 Bai Xiangjie(Shanxi Coking Coal Fenxi Mining Industry Jinxinda Coal Industry,Linfen Shanxi 041000)
机构地区:[1]山西焦煤汾西矿业金辛达煤业,山西临汾041000
出 处:《山西冶金》2022年第3期171-172,367,共3页Shanxi Metallurgy
摘 要:针对大深度巷道掘进作业过程中所面临的矿压波动和应力集中问题突出,提出了一种新的巷道围岩变形控制方案,综合运用高预应力高强锚杆支护、关键部位强力支护、全断面协同支护,实现了对巷道围岩稳定性的有效控制,根据实际应用表明,新的支护方案能够将巷道两帮变形量降低76.9%,将巷道顶底板变形量降低75.1%。In view of the prominent problems of rock pressure fluctuation and stress concentration in the process of large depth roadway excavation, a new roadway surrounding rock deformation control scheme is proposed. The comprehensive use of high prestress and high-strength bolt support, strong support at key parts and full section cooperative support realizes the effective control of roadway surrounding rock stability. According to the practical application, the new support scheme can reduce the deformation of two sides of the roadway by 76.9%, reduce the deformation of roadway roof and floor by 75.1%.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.217.252.20