检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:郭红民[1] 王晓军 许宏鋆 杨莹 张达 康文博 GUO Hong-min;WANG Xiao-jun;XU Hong-yun;YANG Ying;ZHANG Da;KANG Wen-bo(College of Hydraulic and Environmental Engineering,China Three Gorges University,Yichang 443002,China)
机构地区:[1]三峡大学水利与环境学院,湖北宜昌443002
出 处:《水电能源科学》2022年第5期109-112,共4页Water Resources and Power
摘 要:为改善实际工程中侧槽式溢洪道的水流形态,以某实际水库工程为例,结合物理模型试验,通过数值模拟,比较了溢洪道进口侧边结构采用局部削坡、弧形垂直翼墙、变坡翼墙等方案,通过观察进口水流流态、流速、漩涡、紊动能及水面变化等水力学特征,发现采用弧形垂直翼墙的方案可减缓进口的不利流态,达到进口水流平稳的目的,可为类似工程提供参考。In order to improve the water flow state of the side channel spillway in the actual project, taking a practical reservoir project as an example, combined with the physical model test, the schemes of partial slope cutting, arc vertical wing wall and variable slope wing wall were compared through numerical simulation. By observing the hydraulic characteristics such as the inlet flow pattern, velocity, vortex, turbulence kinetic energy and water surface change of the inlet water, it is found that the scheme of using the arc vertical wing wall can slow down the unfavorable flow state at the inlet and achieves the purpose of stabilizing the inlet water flow, which can provide a reference for similar projects.
分 类 号:TV651.12[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49