检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘吉坡 李芳侠 南海娟 张立峰 LIU Jipo;LI Fangxia;NAN Haijuan;ZHANG Lifeng
机构地区:[1]西部宝徳科技股份有限公司,国家地方联合过滤分离工程研究中心,陕西省过滤分离工程研究中心,西安市710201
出 处:《化工装备技术》2022年第2期63-67,共5页Chemical Equipment Technology
摘 要:双降膜吸收器是一种立式容器设备,通过立置吸收管内外壁分布的液体薄膜进行传热。对于规格较小的吸收器,该传热过程实现较为容易,但是对于长度近20000 mm,设备直径达3700 mm的立式吸收器,要在吸收管整个长度范围内实现内外壁液体呈薄膜状均匀分布较为困难。对设备筒体直线度,上管板、3块定位板、下管板4个元件管孔的同心度和装配平行度要求严格,同时,吸收管管头连接处和现场安装的倾斜度也是设备的关键控制点。对以上控制要点进行了叙述,并且阐述了具体实施方法和相关参数。The double falling film absorber was a vertical container device that transferred heat through a liquid film distributed on the outer wall of the built-in absorption tube.For the absorber with smaller specification,the heat transfer process was easy to realize.However,for the vertical absorber with a length of nearly 20000 mm and an equipment diameter of 3700 mm,it was difficult to realize the uniform distribution of liquid on the inner and outer walls in a thin film shape within the whole length of the absorption tube.For the straightness of the equipment barrel,the concentricity and assembly parallelism of the upper tube plate,3 positioning plates and the lower tube plate 4 components were strictly required.At the same time,the inclination of the connection of the absorber tube head and the field installation were also key control points of the equipment.The above control points were described,and the specific implementation methods and related parameters were described.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.117.127.127