摘 要:在高填方石方路基上进行桩基冲击钻进施工,不可避免地会发生偏孔、漏浆、塌孔、卡钻等不利因素,选择适当的处理方法,如偏孔时回填片石、片石混凝土等方法,漏浆时回填优质黏土、低标号混凝土等方法,塌孔时回填片石、混凝土等方法,卡转时高压冲击、爆破等方法,可以达到较好处理效果,有利于节约成本,保证施工安全,控制施工工期。When percussion drilling of pile foundation is carried out on high filling rock subgrade,unfavorable factors such as deviation hole,grout leakage,collapse hole and stuck drill will inevitably occur.Appropriate treatment methods are selected,such as backfilling schist and schist concrete when deflecting holes,backfilling high-quality clay and low-grade concrete when leaking grout,backfilling schist and concrete when collapsed holes,high-pressure impact and blasting when stuck,which can achieve better treatment effect.It is beneficial to save cost,ensure construction safety and control construction period.
关 键 词:高填方 石方路基 桩基 冲击钻进 影响因素 处理方法
分 类 号:U416.11[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49