检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:金丹 JIN Dan(Huadian Yunnan Power Generation Co.,Ltd.,Yilihe Power Plant,Huize 654200,China)
机构地区:[1]华电云南发电有限公司以礼河发电厂,云南会泽654200
出 处:《云南水力发电》2022年第7期220-222,共3页Yunnan Water Power
摘 要:水情日计划报表是水库调度的关键环节,是中调指导水电厂水电经济运行的主要依据,日报表的报送时间影响着各地方后续的许多工作,作为第一手水情资料的获得者,减少水情日报表的报送时间、提高水情日报表报送效率尤为重要。通过分析报表报送时间过长的各种原因,确定主要原因,并相应的制定对策,一一针对并解决各项问题,来提升工作人员报表报送效率,最终在工作人员按方法实施后,日报表的报送时间大大缩短,效率得到明显提高。The plan statement of water regime day is the key link of reservoir dispatching and the main basis for guiding hydropower economic operation of hydropower plant by middle dispatching.The reporting time of daily reports has an impact on many subsequent work in various places.As the first-hand recipient of hydrological data,it is very important to reduce the reporting time of hydrological daily report and improve the efficiency of hydrological daily report.This paper identifies the main reasons by analyzing the reasons for the long reporting time.At the same time,this paper formulates countermeasures to solve various problems,so as to improve the efficiency of staff report submission.After the implementation of the method,the reporting time of daily reports has been greatly shortened and the efficiency has been significantly improved.
分 类 号:TV737[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.216.45.133