检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈英超 CHEN Yingchao(Yakela Gas Production Plant,Northwest Oilfield Branch,Sinopec,Kuqa,Xinjiang 842017,China)
机构地区:[1]中国石化西北油田分公司雅克拉采气厂,新疆库车842017
出 处:《石油管材与仪器》2022年第4期67-70,74,共5页Petroleum Tubular Goods & Instruments
摘 要:雅-大-轮凝析气藏已进入开发中后期,随着越来越多的气井因高含水停喷,需要利用测井资料寻找剩余油,指导停喷气井补孔转层、堵水等措施,恢复停躺井产能,提高采收率。对比各种测井技术的适应性,优选出适合砂岩凝析气藏的测试技术,并通过改进各俘获截面的取值方法,提高剩余油测井解释结果的符合率。对9口井进行二次解释,发现5口井符合生产情况;指导其余4口井措施挖潜,成功率100%,增油2.4×10^(4) t,增气1.4×10^(8) m^(3),有效提高了开发后期措施挖潜成功率。Ya-da-lun condensate gas reservoir has entered the middle and later stage of development.As more and more gas wells stop injection due to high water cut,it is necessary to use logging data to find remaining oil,guide the measures such as filling hole and transferring layer and plugging water against the stopped injection well,restore the production capacity of the shutdown or failed wells and improve the recovery rate.Through optimizing the testing technology for sandstone condensate gas reservoir based on comparing the adaptability of various logging technology,and improving the accessor methods of capture cross sections,the coincidence rate of log interpretation results of residual oil was improved.For the secondary interpretation of the 9 wells,it is found that 5 wells are in line with the production situation.Tapping measures guided by above interpretation were taken on 4 wells and the success rate is 100%,increasing 24000 tons of oil and 140 million m^(3) of gas,which effectively improves the success rate of tapping measures in the later stage of development.
分 类 号:TE151[石油与天然气工程—油气勘探] TE327
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7