检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:黄建文[1,2] 郭松林 王兴霞[1] 周宜红[1,2] 廖再毅[1,3] HUANG Jianwen;GUO Songlin;WANG Xingxia;ZHOU Yihong;LIAO Zaiyi(College of Hydraulic and Environmental Engineering,China Three Gorges University,Yichang 443002,China;Hubei Key Laboratory of Construction and Management in Hydropower Engineering,China Three Gorges University,Yichang 443002,China;Department of Architectural Science,Ryerson University,Toronto Ontario M5B2K3,Canada)
机构地区:[1]三峡大学水利与环境学院,湖北宜昌443002 [2]三峡大学水电工程施工与管理湖北省重点实验室,湖北宜昌443002 [3]Department of Architectural Science,Ryerson University,Toronto Ontario,Canada,M5B2K3
出 处:《武汉大学学报(工学版)》2022年第6期545-554,共10页Engineering Journal of Wuhan University
基 金:国家自然科学基金项目(编号:51879147,52009069);水电工程施工与管理湖北省重点实验室开放基金项目(编号:2019KSD03)。
摘 要:高效的混凝土施工设备协同作业是高拱坝混凝土施工进度、质量和成本的有效保证。为了提高施工系统设备运行效率,优化施工设备配置方案,节约施工成本,加快施工进度,确保施工质量和安全,针对高拱坝混凝土施工设备系统协同作业的多样性及边界复杂性,构建了单队多服务台的施工设备排队服务模型,并基于Arena软件对系统设备运行效率进行了仿真研究。结合具体工程实例进行了模型参数设置和仿真模拟,分析了不同设备配置方案下的设备运行效率,为高拱坝混凝土施工管理提供了决策借鉴。Efficient concrete construction equipment coordinated cooperation is an effective guarantee for the schedule,quality and cost of high arch dam concrete construction.In order to improve the equipment operation efficiency of construction system,optimize the construction equipment configuration scheme,save the construction cost,speed up the construction schedule,and ensure the construction quality and safety,this paper builds a single team and multiple service stations queuing service model of the construction equipment for the diversity and complexity of the collaborative operation of the high arch dam concrete construction equipment system,and simulates the equipment operation efficiency based on Arena software.Combined with a practical engineering project,the model parameter setting and simulation are carried out,and the equipment operation efficiencies of different equipment configuration schemes are analyzed.The study provides a reference for decision-making of high arch dam concrete construction management.
关 键 词:高拱坝 混凝土施工 设备运行效率 ARENA 仿真
分 类 号:TV512[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28