高墩大跨径连续刚构桥施工关键技术分析研究  被引量:3

Analysis of key technology for the construction of high-pier long-span continuous rigid bridge

在线阅读下载全文

作  者:蒋泽晖 Jiang Zehui(China Railway 16th Bureau Group Fifth Engineering Co.,Ltd.,Tangshan 063000,China)

机构地区:[1]中铁十六局集团第五工程有限公司,河北唐山063000

出  处:《江苏科技信息》2022年第18期40-42,共3页Jiangsu Science and Technology Information

摘  要:在高墩大跨径连续刚构桥的实际施工过程中,关键技术的良好使用能有效保证连续刚构桥的施工质量和效率,满足施工的要求。因此,文章分析了高墩大跨径连续刚构桥施工的关键技术,并对高墩大跨径连续刚构桥的施工技术提出建议,实现施工管理人员对实际工程的施工控制,为之后相似桥梁的建设提供具有借鉴意义的施工控制方案。In the actual construction process of the high-pier and long-span continuous rigid structure bridge,the good use of key technologies can effectively ensure the construction quality and efficiency of the continuous rigid structure bridge,and meet the construction requirements.Therefore,this paper analyzes the key technology of high-pier long-span continuous rigid bridge,then puts forward some suggestions for the construction technology of high-pier long-span continuous rigid bridge,realize the construction control of the construction management personnel,and provide a reference construction control scheme for the construction of similar bridge.

关 键 词:高墩 刚构桥 施工技术 

分 类 号:U445[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象