ZYWL-6000Y自动钻机钻杆箱液压系统设计  被引量:2

Design on hydraulic system of drilling rod box of ZYWL-6000Y automatic drilling rig

在线阅读下载全文

作  者:刘小华 LIU Xiaohua(Chongqing Research Institute of China Coal Technology&Engineering Group,Chongqing 400039,China;National Key Laboratory of Gas Disaster Detecting,Preventing&Emergency Controlling,Chongqing 400039,China)

机构地区:[1]中煤科工集团重庆研究院有限公司,重庆400039 [2]瓦斯灾害监控与应急技术国家重点实验室,重庆400039

出  处:《矿山机械》2022年第7期12-15,共4页Mining & Processing Equipment

基  金:重庆英才计划“包干制”项目(cstc2021ycjh-bgzxm0258)。

摘  要:在煤矿井下的自动钻孔作业中,为进一步提高施工效率和安全性,可通过增加自动钻机的钻杆箱容量来减少添加钻杆的次数和停机时间,从而减少操作人员在孔口的作业时间。钻杆箱容量增大导致结构形式发生变化,从而需要一种新的钻杆箱液压系统与之相匹配。通过分析自动上杆系统的动作流程,设计了箱式钻杆箱的液压系统,并对关键的托举液压缸进行了选型计算与校核计算。样机测试和工业性试验表明,该钻杆箱液压系统可与机械手相匹配实现自动上杆操作,动作运行流畅,性能稳定,达到了设计要求。During automatic drilling operation in underground collieries,in order to further improve the construction efficiency and safety,the volume of the drilling rod box of the automatic drilling rig was usually increased so as to reduce the number of times and downtime of the drilling rod addition,as well as decrease the working duration of the operator at the orifice.The increase in the volume of the drilling rod box leaded to the change of its structural mode,therefore a new kind of hydraulic system matched with the drilling rod box was needed.After the analysis on the motion flow of the automatic drilling rod addition,the hydraulic system of the drilling rod box was designed,the sizing calculation and checking calculation of the key component of lifting cylinder were conducted.Prototype test and industrial test showed the hydraulic system of the drilling rod box was matched with the manipulator so as to realize the automatic drilling rod addition with smooth motion and stable performance,which met the design requirements.

关 键 词:自动钻机 钻杆箱 液压系统 

分 类 号:TD41[矿业工程—矿山机电] TH13[机械工程—机械制造及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象