检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:林华艺 LIN Huayi
机构地区:[1]福建工大建设工程检测有限公司,福建福州350100
出 处:《福建建设科技》2022年第4期28-31,共4页Fujian Construction Science & Technology
摘 要:以某多层建筑纠倾加固项目为背景,通过检测鉴定对房屋主体结构安全进行全面检查,针对重点安全问题进行方案设计,在深厚淤泥土层上的片筏基础采用锚杆静压桩结合水冲掏土法进行纠倾加固,施工过程通过实时监测手段稳步扶正,纠倾后房屋的最大顶点侧向位移为H/750,符合规范要求,后期沉降收敛且稳定,加固实施效果明显,经济性好,可为此类工程提供借鉴。Based on a multi-storey building rectification and reinforcement project,the safety of the main structure of the house is comprehensively inspected through detection and identification,and the scheme design is carried out for key safety issues.The static bolt-pressing piles and water flushing digging are used for rectification and reinforcement in the sheet raft foundation on a deep silt layer.The construction process is steadily rectified by means of real-time monitoring.The maximum lateral displacement of the apex of the house after rectification is H/750,which meets the requirements of the specification.The later settlement is convergent and stable,and the reinforcement implementation effect is obvious and economical.The study result could provide a reference for the design and construction of similar building rectification projects.
关 键 词:多层建筑 检测鉴定 纠倾加固 锚杆静压桩 水冲掏土法
分 类 号:TU746.3[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.158