老旧小区屋顶花园承洪韧性预测——以长春市为例  

Forecast of the Resilience of the Old Residential Building Roof Garden to Flooding——with Changchun City as an Example

在线阅读下载全文

作  者:赵彦博[1] 赵珩 齐伟民[1] ZHAO Yan-bo;ZHAO Heng;QI Wei-min(Jilin Jianzu University,Changchun Jilin 130119,China)

机构地区:[1]吉林建筑大学,吉林长春130119

出  处:《吉林工程技术师范学院学报》2022年第5期88-92,共5页Journal of Jilin Engineering Normal University

基  金:吉林省科技厅科技发展计划项目(20210203144SF)。

摘  要:近年来长春市老旧小区面临严重的雨洪问题。通过相关公式的计算,来预测屋顶花园的雨水滞留量及滞留时间,有效体现屋顶花园的承洪韧性。结果表明,研究区域改造屋顶花园完毕后,可滞留雨水量范围为383.85~505.93m^(3)。当降雨历时为60min、基质层滞水量范围从最小到最大且重现期为10a一遇、20a一遇和50a一遇时,基质层达到饱和状态时所需时间范围分别为52~69min, 44~59min和38~50min;当降雨历时为90min、基质层滞水量范围从最小到最大且重现期为10a一遇、20a一遇和50a一遇时,基质层达到饱和状态时所需时间范围分别为67~88min, 57~75min和49~65min。In recent years, the old community of Changchun City has faced serious rainfall and flooding problems. The rainwater retention and retention time of the roof garden are predicted with relevant formula, which effectively reflects the flooding resilience of the roof garden. The results show that the amount of rainwater retained after the roof garden renovation in the study area is 383.85~505.93 m^(3). When the duration of rainfall is 60 min, the amount of water lag in the substrate layer is 10 a once, 20 a once and 50 a once in the reproduction period from the minimum to the maximum, the required time range when the substrate layer reaches the saturation state is 52~69 min, 44~59 min and 38~50 min, respectively;when the duration of rainfall is 90 min, the amount of water lag in the substrate layer is 10 a once, 20 a once and 50 a once in the reproduction period from the minimum to the maximum, the required time range when the substrate layer reaches the saturation state is 67~88 min, 57~75 min and 49~65 min, respectively.

关 键 词:老旧小区 屋顶花园 承洪韧性 

分 类 号:TU992[建筑科学—市政工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象