Causes of and Solutions to Overcapacity in the New Energy Industry:Taking Wind Energy and Solar Energy as Examples  被引量:1

在线阅读下载全文

作  者:WANG Lei 

机构地区:[1]Institute of Industrial Economics Chinese Academy of Social Sciences,Beijing 100836,P.R.China

出  处:《Chinese Journal of Urban and Environmental Studies》2017年第1期78-92,共15页中国城市与环境研究(英文)

基  金:funded by the “Study of Major Issues in the Energy Field of China” (2016), Philosophy and Social Sciences Innovation Project, Chinese Academy of Social Sciences

摘  要:Although overcapacity in equipment manufacturing link of the new energy industry represented by solar and wind energies has been improved in recent years, overcapacity in the power generation and utilization links is still serious. Many policies have been issued to solve this problem,yet their outcomes hardly met the expectations. The low utilization rate of power generation equipment and high curtailment of wind and photovoltaic power further hamper the healthy development of the new energy industry. The author holds that the overcapacity is an inevitable result of the thinking mode and investment mechanism based on the traditional fossil fuel system.Constrained by such an inappropriate development model, many policies failed to thoroughly solve the problems emerging in the development of the new energy industry. Thus, it is necessary to focus on the characteristics of new energies, transform the development path, establish a suitable development and utilization model and an electric system that favors new energy, and break down the institutional and organizational barriers for the healthy development of the new energy industry.

关 键 词:New energy industry OVERCAPACITY electric system reform 

分 类 号:F426.2[经济管理—产业经济] F426.6

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象