检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:贾军飞 JIA Junfei(Gansu Water Resourcs and Hydropower Survey and Design and Research Instiute Co.LTD,Lanzhou 730000,China)
机构地区:[1]甘肃省水利水电勘测设计研究院有限责任公司,甘肃兰州730000
出 处:《河南水利与南水北调》2022年第6期112-114,共3页Henan Water Resources & South-to-North Water Diversion
摘 要:近年来,中国新能源项目迅速发展,尤其是在戈壁、荒漠地区大力发展风电、光电项目,具有重大的经济效益、生态环境效益及社会效益,而戈壁、荒漠地区盐渍土分布较为广泛,对工程建设影响较大。结合马鬃山地区项目建设中遇到的盐渍土的特点,通过钻探、原位测试及室内试验等工作,查明了该地区盐渍土的工程地质特性,分析了盐渍土的空间分布规律、气候特征、溶陷性、盐胀性及腐蚀性等物理力学性质,提出了针对工程合理的基础埋置深度,并探讨了盐渍土地基的工程处理措施。In recent years, China’s new energy projects have developed rapidly, especially in the gobi and desert areas. Vigorously develop wind power and photoelectric projects, which have great economic, ecological, environmental and social benefits. The saline soil is widely distributed in the gobi and desert areas which has great influence on engineering construction. Based on the characteristics of saline soil encountered in the project construction in Mazongshan Area, the engineering geological characteristics of saline soil in this area are found out through drilling, in-situ test and laboratory test. In this paper, the spatial distribution law, climate characteristics, physical and mechanical properties of saline soil, such as solubility, salt swelling and corrosiveness, are analyzed, and the reasonable foundation burial depth for engineering is put forward. The reasonable foundation burial depth for the project is put forward and the engineering treatment measures of saline soil foundation are discussed.
分 类 号:TV221.2[水利工程—水工结构工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7