检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘兴旺[1] 李冰河[1] 陈卫林 毛海和 张戈 孙政波 LIU Xingwang;LI Binghe;CHEN Weilin;MAO Haihe;ZHANG Ge;SUN Zhengbo(Zhejiang Province Institute of Architectural Design and Research,Hangzhou 310006,China;Zhejiang Shengyuan Construction Engineering Construction Drawing Review Center,Hangzhou 310006,China;Hangzhou Branch of Beijing Urban Construction Design and Development Group Co.,Ltd.,Hangzhou 310017,China)
机构地区:[1]浙江省建筑设计研究院,杭州310006 [2]浙江盛院建设工程施工图审查中心,杭州310006 [3]北京城建设计发展集团股份有限公司杭州分公司,杭州310017
出 处:《建筑结构》2022年第15期136-141,共6页Building Structure
基 金:浙江省建设科研项目(2018K119);浙江省科技创新项目(2019R52035)。
摘 要:杭州中心项目位于杭州市武林广场核心商圈,设6层地下室,基坑开挖深度约30.2~36.0m,紧邻地铁1号线和3号线盾构隧道。针对该工程所面临的深厚软土深大基坑变形控制和敏感设施保护难题,综合采取了地下室平面及竖向优化布置、分坑施工、软土时空效应定量控制等多种技术。介绍了该项目基坑支护设计与施工要点,总结了该深大基坑施工过程中的围护体系和邻近地铁设施的变形发展规律,分析了软土地基超深基坑变形性状。结果表明,地下结构施工全部完成后成功地将邻近盾构隧道的水平变形、竖向变形及水平收敛变形均控制在5mm之内,满足要求。Hangzhou Center project is located in the core business district of Hangzhou Wulin Plaza,with a 6-storey basement.The excavation depth of the foundation pit is about 30.2~36.0 m,close to the shield tunnel of Metro Line 1 and Line 3.In view of the difficult problems of deformation control and sensitive facilities protection of the deep and large foundation pit in deep soft soil faced by this project,the design has comprehensively adopted a variety of measures such as the optimization of basement plane and vertical layout,pit-dividing construction and quantitative control of soft soil space-time effect.The key points of foundation pit support design and construction of the project was introduced,the deformation development law of the retaining system and adjacent subway facilities during the construction of the deep and large foundation pit was summarized,and the deformation behavior of super deep foundation pit in soft soil foundation was analyzed.The results show that after the construction completion of underground structure,the horizontal deformation,vertical deformation and horizontal convergence deformation of adjacent shield tunnel are successfully controlled within 5 mm,which meets requirement.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.118.155.106