检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:霍进珂 邱凯 张满江红[1] 艾鹏飞[1] 刘洋[1] 何高塬 Huo Jin-ke;Qiu Kai;Zhang Man-jiang-hong;Ai Peng-fei;Liu Yang;He Gao-yuan
机构地区:[1]中国建筑第二工程局有限公司华南分公司,深圳518000
出 处:《建筑技术开发》2022年第13期72-74,共3页Building Technology Development
摘 要:由于综合管廊的大型管道管径较大,重量大,作业空间小,导致大型管道的吊装运输成为综合管廊施工过程中的一个重难点。就本项目综合管廊大型管道吊装运输的实际情况进行介绍,并对在吊装过程中及综合管廊内进行二次转运的施工时存在的关键技术问题与重难点进行了详细说明。Due to the large diameter, heavy weight and small working space of the large-scale pipelines in the integrated pipe gallery, the hoisting and transportation of large-scale pipelines has become a major difficulty in the construction of the integrated pipe gallery. This paper introduces the actual situation of hoisting and transportation of large-scale pipelines in the integrated pipe gallery of this project, and describes in detail the key technical problems and difficulties in the hoisting process and the construction of secondary transfer in the integrated pipe gallery.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15