检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:林泽辉 Lin Ze-hui
机构地区:[1]广州地铁设计研究院股份有限公司,广州510000
出 处:《建筑技术开发》2022年第14期156-158,共3页Building Technology Development
摘 要:以长沙市湘府路隧道明挖基坑上跨地铁1号线工程为依托,运用数值分析模拟和现场监测验证的方式,对敏感地层中近距离基坑开挖对运营地铁变形影响开展了研究,针对性提出了基底加固后的分段分步卸载封闭法基坑开挖技术。结果表明:数值计算结果与监测数据变化情况基本吻合,基坑开挖完成后最不利的竖向隆起值及水平收敛值分别达到5.71 mm,2.47 mm,均小于现行规范要求,可认为该措施能有效控制敏感地层中近距离基坑开挖下既有隧道结构的变形。In changsha city of hunan province road tunnel cut across the subway line 1 on foundation pit engineering as the backing,with the method of numerical simulation and field monitoring,close to sensitive formation in foundation pit excavation deformation influence of operating metro has carried out research,targeted put forward the basal step by step in different sections of the reinforced unload closed fermentation pit excavation technology.The results show that the numerical calculation results are basically consistent with the monitoring data.The most unfavorable vertical uplift value and horizontal convergence value after foundation pit excavation are 5.71mm and 2.47mm,respectively,which are both lower than the requirements of the current code.It can be considered that the method can effectively control the deformation of the existing tunnel structure under close foundation pit excavation in sensitive strata.
关 键 词:敏感地层 基坑开挖 分段分步卸载封闭法 变形控制
分 类 号:TU753[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.218.196.220