检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:易守安[1] 林攀 魏晨阳 Yi Shouan;Lin Pan;Wei Chenyang(Ma'anshan Iron&Steel Co.,Ltd.,Ma'anshan 243000,Anhui)
机构地区:[1]马鞍山钢铁股份有限公司,安徽马鞍山243000
出 处:《河北冶金》2022年第7期66-70,共5页Hebei Metallurgy
摘 要:针对马钢脱脂线原设计产能不能满足需要的实际问题,研究了生产过程中影响产能提升的主要因素并实施了相应改进。解决了电极板腐蚀变形、带钢表面液体残留、清洗段大量漏液、高速生产时清洗段带钢容易跑偏、清洗段带钢表面清洗效果不佳、电解电流的设置不合理、热风干燥箱刮伤带钢、清洗段辊轴经常断裂、高速刷辊抖动等因素带来的不利影响。脱脂线的产量从设计5.83万t/月提升到最高7.4万t/月,提升26.9%,效果非常明显。Aiming at the actual problem that the original design capacity of Masteel degreasing line cannot meet the needs,the main factors affecting capacity improvement in production process were studied and corresponding improvements were implemented.It solves the adverse effects of electrode plate corrosion and deformation of strip surface liquid residual,large amount of liquid leakage in cleaning section,steel-strap deviation in high speed,poor cleaning effect of the steel surface,unreasonable electrolytic current setting,strip scratching by the hot air-drying oven,often roller fracture in the strip cleaning section,high speed brush roll jitter and other factors.The output of degreasing line increased from 58300 t/month to the highest 74000 t/month,up by 26.9%.
分 类 号:TG335[金属学及工艺—金属压力加工]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:13.59.0.231