检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:周鹏 郎兴华 陶元 朱美 ZHOU Peng;LANG Xinghua;TAO Yuan;ZHU Mei(Appraisal Center for Environment and Engineering,Ministry of Ecology and Environment,Beijing 100012,China;National Key Laboratory of Numerical Simulation of Environmental Protection Environmental Impact Assessment,Beijing 100012,China;Beijing Zhong Huan Ge Yi Technology Consulting Co.,Ltd.,Beijing 100012,China)
机构地区:[1]生态环境部环境工程评估中心,北京100012 [2]国家环境保护环境影响评价数值模拟重点实验室,北京100012 [3]北京中环格亿技术咨询有限公司,北京100012
出 处:《环境影响评价》2022年第4期48-53,共6页Environmental Impact Assessment
基 金:生态环境部“环境保护标准绿色通道项目”。
摘 要:回顾了建设项目竣工环境保护验收的发展历程,梳理了建设项目竣工环保验收由行政部门负责验收调整为建设单位自主验收后,验收效能显著提升、事中事后监管力度明显加大的改革成效。同时,分析了各级生态环境部门在验收检查中发现的建设单位未严格落实生态环保主体责任、属地生态环境部门监管不到位、验收报告存在严重质量问题、政府承诺事项进展缓慢等主要问题,并提出弱化污染影响类项目验收、强化生态影响类项目验收,加快推进验收技术规范制修订,加强指导、压实责任、提升信息化水平等管理建议。This paper reviewed the development process of the environmental protection acceptance management of completed construction projects,and sorted out the reform results which are∶after the environmental protection acceptance of completed construction projects was adjusted from the responsibility of the administration to the independent acceptance of the construction unit,the acceptance efficiency was significantly improved,and the supervision during and after the event was significantly strengthened.At the same time,the main problems found by the ecological environment departments at all levels in the acceptance inspection such as the failure of the construction units to strictly implement the main responsibility of ecological environmental protection,the lack of supervision of the territorial ecological environment department,serious quality problems of the acceptance reports,and indolent government promises were analyzed.At last,suggestions such as weakening the acceptance of pollution impact projects while strengthening the acceptance of ecological impact projects,accelerating the promulgation and revision of various acceptance technical specifications,and strengthening the guidance,compacting responsibility,improving the level of informatization technology were proposed.
关 键 词:建设项目 竣工环境保护验收 自主验收 污染影响 生态影响
分 类 号:X324[环境科学与工程—环境工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.188.48.106