检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:廖孝彦 LIAO Xiao-yan(Hunan Construction Transportation Construction Co.,Ltd.,Changsha,Hunan 410004,China)
机构地区:[1]湖南建工交通建设有限公司,湖南长沙410004
出 处:《黑龙江交通科技》2022年第7期91-93,共3页Communications Science and Technology Heilongjiang
摘 要:针对现代交通网络建设中公路交叉施工问题,结合工程实践中减少既有线路的破坏与周围环境的影响等要求,提出了钢筋混凝土箱涵顶推施工方法。围绕平益高速平江南互通A匝道、E匝道及6 m×5 m箱型通道顶推下穿平汝高速工程,分析了钢筋混凝土箱涵顶推施工流程及施工难点,给出了施工技术要点,强调做好箱体位置监测与偏差调控,保证箱涵施工效果。Aiming at the problem of highway crossing construction in modern traffic network construction,combined with the requirements of reducing the damage of existing lines and the impact of surrounding environment in engineering practice,the jacking construction method of reinforced concrete box culvert is proposed.Around PingyiExpressway Pingjiangnan interchange A ramp,E ramp and 6 m×5 m box channel jacking down through Pingru Expressway Project,gives the key points of construction technology,and emphasizes the monitoring of box position and deviation regulation to ensure the construction effect of box culvert.
分 类 号:U445[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7