检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Fahad Maoulida Kassim Mohamed Aboudou Djedjig Rabah Mohammed El-Ganaoui
机构地区:[1]Laboratory,LEMA,Faculty of Sciences and Techniques,University of Comoros,Moroni,Comoros [2]Laboratory,LERMAB,IUT Henri Poincaréof Longwy,University of Lorraine,Nancy,France [3]IREMIS Institute,CUFR,University of Mayotte,Dembeni Mayotte,France
出 处:《Fluid Dynamics & Materials Processing》2022年第6期1607-1617,共11页流体力学与材料加工(英文)
摘 要:In this work,we present a feasibility study for a new hybrid power plant(PV-Wind-Diesel-Storage)directly connected to the electrical grid.Several simulations are performed to verify the performance of the hybrid system under different scenarios using real meteorological data.It is shown that the performances of the hybrid system connected to the electrical network depend obviously on the available energy resources and constraints because the renewable energies are intermittent.In addition,the price of the kWh of electricity supplied by the hybrid system is determined,which amounts to$0.209/kWh,which is very cost effective and satisfactory for the considered sample conditions(Comoros Island).
关 键 词:Hybrid energy renewable energy HOMER connected grid
分 类 号:TP3[自动化与计算机技术—计算机科学与技术]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.118.32.150