某偏置连体大底盘双塔超限结构设计  被引量:2

Structural Analysis of an Over-Limit Twin Towers with Offset Connection

在线阅读下载全文

作  者:阮林旺 黄林 刘浩晋 RUAN Linwang;HUANG Lin;LIU Haojin(Tongji Architectural Design(Group)Co.,Ltd.,Shanghai 200092,China)

机构地区:[1]同济大学建筑设计研究院(集团)有限公司,上海200092

出  处:《结构工程师》2022年第3期179-189,共11页Structural Engineers

摘  要:上海某偏置连体高层建筑,采用钢框架-中心支撑结构体系,存在扭转不规则、楼板不连续、侧向刚度不规则、大底盘双塔及连体结构等多项超限内容。针对以上内容,运用YJK与ETABS两款软件进行了对比分析,采用YJK进行弹性时程分析,采用ETABS进行弹塑性动力时程分析与楼板应力分析,并对关键的大底盘双塔部分进行了专项分析。结果表明,结构具有良好的承载能力与抗震性能。A high-rise building with offset connection in Shanghai,using frame-center support structural system,contains several over-limit contents such as torsion irregularity,floor discontinuity,latral stiffness irregularity,large chassis with twin towers and connected structure.According to these,YJK and ETABS are used to conduct comparative analysis.Elastic time history analysis is conducted with YJK and elastic-plastic dynamic time history analysis and floor stress analysis are conducted with ETABS.In addition,a specialized analysis based on the large chassis twin towers is carried out.The results show that the structure has good bearing capacity and seismic performance.

关 键 词:连体结构 超限高层结构 弹性时程分析 弹塑性动力时程分析 楼板应力分析 

分 类 号:TU973.31[建筑科学—结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象