检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:路飞飞[1] 于洋[1] 王伟志[2] 李明军[2] LU Feifei;YU Yang;WANG Weizhi;LI Mingjun(Petroleum Engineering Technology Research Institute,Sinopec Northwest Oilfield Company,Urumqi,Xinjiang,830011,China;Petroleum Engineering Supervision Center,Sinopec Northwest Oilfield Company,Luntai,Xinjiang,841600,China)
机构地区:[1]中国石化西北油田分公司石油工程技术研究院,新疆乌鲁木齐830011 [2]中国石化西北油田分公司石油工程监督中心,新疆轮台841600
出 处:《石油钻探技术》2022年第4期31-36,共6页Petroleum Drilling Techniques
基 金:中国石化重点科技项目群“顺北特深层断裂破碎带区块安全成井关键技术”(编号:PE19004)课题三“顺北一区易漏失地层固井技术研究与应用”部分研究内容。
摘 要:顺北油气田二叠系固井极易发生漏失,环空水泥缺失长度超过2000 m,导致生产期间套损严重。针对该问题,研制了封隔式分级箍,并进行了室内性能评价试验和现场应用。室内性能评价试验发现,该分级箍不仅具有常规分级箍的功能,还可以在一级固井后胀封封隔器,封隔漏层,防止二级固井时发生漏失,提高环空水泥环完整性;封隔器胀封后,环空封隔能力可达20 MPa;循环孔关闭后,管内密封能力不低于套管抗内压强度。顺北油气田9口井应用了封隔式分级箍,二级固井平均漏失量由105.1 m3降至3.5 m3,环空水泥缺失长度由2048 m缩短至350 m,节约固井成本约1100万元。封隔式分级箍解决了长裸眼易漏失井段固井时的漏失问题,为顺北油气田的高效开发提供了技术支撑。Permian cementing was leakprone in the Shunbei Oil&Gas Field,and the loss of annular cement surpassed 2000 m,which led to severe casing damage in the production period.To solve this problem,a stage cementing collar with packer was developed,performance evaluated in the laboratory,and applied in fields.The tool works well not only with the conventional function of the stage cementing collar,it can also expand the packer upon the first-stage cementing to seal the layers and prevent the leakage of the second-stage cementing and thus improve the integrity of annular cement sheaths.After the expansion,the annular sealing capacity of the tool could reach 20 MPa,and when the circulation holes were closed,the internal sealing capacity should not be lower than the internal pressure strength of the casing.The developed tool was applied in nine wells of the Shunbei Oil&Gas Field.The results revealed that the average leakage of the second-stage cementing was reduced from 105.1 m3 to 3.5 m3,and the missing length of annular cement declined from 2048 m to 350 m,saving about 11.0 million yuan in cementing.The stage cementing collar with packer could solve the leakage problem in the cementing of the leakprone well sections which tend to leak in long open holes.The lessons learned in this study provide technical support for the efficient development of the Shunbei Oil&Gas Field.
分 类 号:TE925.2[石油与天然气工程—石油机械设备]