检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:金晨 JIN Chen(Shanghai Urban Construction Design&Research InstituteCo.,Ltd.,Shanghai 200125,China)
机构地区:[1]上海市城市建设设计研究总院(集团)有限公司,上海200125
出 处:《中国市政工程》2022年第4期44-47,122,共5页China Municipal Engineering
摘 要:水土流失量的预测是越江隧道工程水土保持方案编制的关键。在研究水土流失量预测方法的基础上,以上海黄浦江龙水南路越江隧道新建工程为例进行预测分析,提出了相应的防治措施,为越江隧道工程的水土流失预测和防治提供借鉴和参考。The prediction of water&soil loss is the key to the preparation of water&soil conservation plan for the tunnel crossing the river.On the basis of studying the prediction method of water and soil loss,taking the new project of South Longshui Rd.Cross River Tunnel on Huangpu River in Shanghai as an example,the prediction&analysis are carried out,and the corresponding prevention&control measures are put forward,which provides reference for the prediction&prevention of water&soil loss of cross river tunnel project.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.137.169.218