检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张辉荣 ZHANG Hui-rong(Shanghai Urban Construction Municipal EngineeringCo.,Ltd.,Shanghai 200065,China)
机构地区:[1]上海城建市政工程(集团)有限公司,上海200065
出 处:《中国市政工程》2022年第4期90-93,98,128,共6页China Municipal Engineering
摘 要:鄱余特大桥工程项目因乐安河阻隔,预制小箱梁跨河运输工程量大,也是影响总工期的关键。基于预制小箱梁跨河运输施工功能要求及水文地质条件,进行多方案对比分析,推荐采用组合钢结构提升站结合驳船运输过河方案。详细介绍了提升站施工设计的各项关键工况和结构设计控制要点。这可为今后同类型桥梁上部结构预制梁过河运输方案比选及施工设计提供参考。The Poyu Super-Large Bridge project is blocked by Le'an River,and the transportation of prefabricated small box girder across the river is large,which is also the key to the total construction period.Based on the functional requirements&hydrogeological conditions of prefabricated small box girder cross river transportation,the comparison&analysis of multiple schemes are carried out,and the scheme of combined steel structure lifting station combined with barge transportation is recommended.The key working conditions&structural design control points of the construction design of the lifting station are introduced in detail;which can provide a reference for the comparison&selection of transportation schemes and construction design of prefabricated beams for the superstructure of the same bridge in the future.
关 键 词:预制小箱梁 过河运输 综合比选 组合钢结构提升站 计算模型 施工设计
分 类 号:U445.4[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.227.49.178