检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:殷旭锋 YIN Xufeng(Jiangmen Power Supply Bureau of Guangdong Power Grid Co.,Ltd.,Jiangmen,Guangdong 529000,China)
机构地区:[1]广东电网有限责任公司江门供电局,广东江门529000
出 处:《山西电力》2022年第4期5-8,共4页Shanxi Electric Power
摘 要:依据地区电网发展状况与运行特点,建立电网企业投资能力评估指标体系,采用投影寻踪模型确定指标权重,结合灰色关联理论,计算出各地区电网企业综合效益评估值,在此基础上提出了基于效益的多目标投资决策模型,实现了对各地区电网的投资最优分配,为电网企业投资规划提供指导。According to the development and operation characteristics of regional power grid,investment ability evaluation index system of power grid enterprises is established and the index weight is determined with projection pursuit model.Combined with Grey Relation Theory,the comprehensive benefits evaluation value of power grid enterprises in each region is calculated.On this basis,a multi-objective investment decision-making model based on benefit is proposed to realize the optimal allocation of investment to the power grid in each region,which provides guidance for the investment planning of power grid enterprises.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.22.41.47