Experimental Study on Improvement Effects of Completely Weathered Phyllite Using Red Clay and Cement for High-Speed Railway Embankments  被引量:1

在线阅读下载全文

作  者:Xiushao Zhao Jianglong Rao Qijing Yang Yu Rong Zhitao Fu Zhiyao Wang Zixi Chen 

机构地区:[1]Engineering Research&Development Centre for Underground Technology of Jiangxi Province,East China Jiaotong University,Nanchang,China [2]Arcadis Australia Pacific Pty Ltd.,Sydney,Australia [3]School of Qilu Transportation,Shandong University,Jinan,China

出  处:《Journal of Renewable Materials》2022年第5期1287-1305,共19页可再生材料杂志(英文)

基  金:This work is supported by the National Natural Science Foundation of China(Grant Nos.52068027,51668018,51768021).

摘  要:Completely weathered phyllite(CWP)has the characteristics of difficult compaction,low shear strength after compaction and large settlement after construction.The traditional improvement method using a single agent of red clay or cement for CWP satisfies the subgrade requirements for ordinary railway,but cannot meet the requirements of immediate strength and long-term post-construction settlement of high-speed railway at the same time.A series of experimental investigations were undertaken for the blended CWP soils,with three additives used.The first additive was red clay,the second was cement and the third was a combination of both red clay and cement at various portions.Results of consolidation test and shear strength test carried out for the treated CWP soils show that:1)The effect of cement on improving the compression modulus of CWP is much better than that of red clay;2)The settlement of an embankment of 10 m high formed by blended soil of CWP with 3%cement can be controlled within 15 mm,while the settlement will be 25.15 mm for the same embankment of blended soil of CWP with 40%red clay;3)The shear strength and ultimate bearing capacity of CWP improved by red clay are much better than those of 5%cement;4)The ultimate bearing capacity of CWP improved by 40%red clay is 3.42 times of that by 3%cement and 2.95 times by 5%cement.Furthermore,the bearing capacity of CWP when improved by red clay can meet railway subgrade requirements immediately after compaction,while cement improved CWP needs a curing time of 1 day or longer.This is an impediment to rapid construction process.The improvement mechanism of red clay is mainly filling effect and grading improvement effect,while the improvement mechanism of cement is mainly hardening reaction,which produces high strength material to cement.It is found that 40%red clay and 3%cement treated CWP,which is considered to be optimum,can meet the subgrade requirements of both immediate bearing capacity and long-term post-construction settlement for the high-speed railway.

关 键 词:Completely weathered phyllite(CWP) red clay cement content immediate strength post-construction settlement high-speed railway 

分 类 号:TQ172.1[化学工程—水泥工业]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象