基于BIM的EPC项目信息价值链增值研究  被引量:2

Information Loss and Transmission Optimization of Construction Projects under EPC Mode

在线阅读下载全文

作  者:方俊[1] 葛倚兵 FANG Jun;GE Yi-bing(School of Civil Engineering and Architecture,Wuhan University of Technology,Wuhan 430070,China)

机构地区:[1]武汉理工大学土木工程与建筑学院,武汉430070

出  处:《建材世界》2022年第4期49-52,82,共5页The World of Building Materials

摘  要:该文依据信息价值链理论,从信息价值影响EPC项目价值的角度出发,构建EPC项目传统信息价值链模型,分析该模型无法完全实现价值增值的原因,再基于BIM技术提高信息共享效率的特点对模型进行优化重构,建立基于BIM的EPC项目信息价值链模型,并对优化模型的增值路径和增值效果进行定性分析,实现EPC项目的价值增值。Based on the theory of information value chain,this paper constructed the traditional information value chain model of EPC projects from the perspective that information value affected the value of EPC projects,analyzed the reasons why the model couldn’t fully realize the added value,and then optimized and reconstructed the model based on the characteristics of BIM technology to improve the efficiency of information sharing,established the information value chain model of EPC projects based on BIM,and made qualitative analysis on the value-added path and value-added effect of the optimized model,so as to realize the value-added of EPC projects.

关 键 词:EPC 信息孤岛 信息价值链 BIM 信息增值 

分 类 号:TU17[建筑科学—建筑理论] TU71

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象