检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:史娟娟 SHI Juan-juan(Yunnan Huadian Ludila Hydropower Co.,Ltd.,Kunming 650000,China)
机构地区:[1]云南华电鲁地拉水电有限公司,云南昆明650000
出 处:《云南水力发电》2022年第8期12-15,共4页Yunnan Water Power
摘 要:枯水期保证水库水位在1221m及以上的前提下,依据鲁地拉水电站近几年枯水期运行数据,综合分析耗水率与各变量之间的关系,将鲁地拉水电站水库优化调度问题,转化成了一个处理发电计划与耗水率相关关系的问题,形成一套“多退少补”的优化水库调度模式。得出鲁地拉水电站枯水期水库运行日动态调度相关关系:N_(t+1.日计划)=Q_(t-1.来)/μ_(t-1)+ΔW_(t-1)。The requirement of guaranteeing reservoir water level in dry season is 1221m or above.According to operation data of Ludila Hydropower Station in dry season in recent years,the relationship between water consumption rate and various variables is comprehensively analyzed in this paper.The problem of reservoir optimal operation of Ludila Hydropower Station is transformed into a problem dealing with the relationship between power generation plan and water consumption rate,forming an optimum reservoir operation mode of"retreat more fill less".It is concluded that the correlation of dynamic operation of reservoir in dry season of Ludila Hydropower Station is N_(t+1.日计划)=Q_(t-1.来)/μ_(t-1)+ΔW_(t-1).
分 类 号:TV212.5[水利工程—水文学及水资源]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.148.212.53