检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张溜溢 ZHANG Liu-yi(Shanghai Investigation,Design&Research Institute Co.,Ltd.,Sichuan Branch,Chengdu 610000,China)
机构地区:[1]上海勘测设计研究院有限公司四川分公司,四川成都610000
出 处:《云南水力发电》2022年第8期134-137,共4页Yunnan Water Power
摘 要:对于水利工程来讲,必须要对地质问题予以高度重视。如果在设计施工的过程之中没有能够充分考虑和处理地质问题,那么就可能带来非常严重的后果。结合具体案例,针对贵州省某水库工程河床坝基开挖揭露的断层,结合所开展的专门性工程地质勘察研究,通过综合试验和分析成果对坝基岩体进行了工程地质分类,探讨了对重力坝建基面的影响,从而得出了岩体建坝的可行性。For hydraulic engineering,geological problems must be highly valued.If geological problems are not fully considered and handled in the process of design and construction,it may bring about very serious consequences.In view of the faults uncovered during the excavation of the riverbed dam foundation of a reservoir project in Guizhou Province,the rock mass of the dam foundation is classified by comprehensive test and analysis results in combination with the special engineering geological investigation and research carried out in this paper.The influence on the foundation surface of gravity dam is discussed,and the feasibility of dam construction by rock mass is obtained.
关 键 词:河床坝基 岩体分级 断层 断层影响带 物理力学参数
分 类 号:TV223.32[水利工程—水工结构工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117