检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈铭[1] CHEN Ming(Xinjiang Institute of Water&Hydropower Engineering Investigation,Design and Research co.,Led.of CREEC.,Urumchi 830000,China)
机构地区:[1]新疆水利水电勘测设计研究院有限责任公司,新疆乌鲁木齐830000
出 处:《云南水力发电》2022年第8期138-140,共3页Yunnan Water Power
摘 要:BLK水电站工程电站厂房基础坐落于砂砾石地基上,基础允许承载力不高。由于水电站厂房的结构形式复杂,结构的受力和边界条件等也比较复杂,常规的结构分析方法难于准确了解结构的变形规律和应力分布,通过有限元模型做整体结构计算,对厂房沉降及承载力进行分析,并根据分析结果进行基础处理应用于工程实际。The power house foundation of BLK Hydropower Station is located on the sand and gravel foundation with low allowable bearing capacity.Due to the complex structure form of hydropower plant,the stress and boundary conditions of the structure are also complicated,so it is difficult to accurately understand the deformation law and stress distribution of the structure by conventional structural analysis methods.Finite element model is used to calculate the overall structure,and the settlement and bearing capacity of the powerhouse are analyzed.Based on the analysis results,the foundation treatment is applied to the engineering practice.
分 类 号:TV142.1[水利工程—水力学及河流动力学] TV223.21
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.144.206.193