检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:赵冲 ZHAO Chong(Yunnan Wenshan Hydropower Survey and Design Institute,Wenshan 663000,China)
机构地区:[1]文山壮族苗族自治州水利电力勘察设计院,云南文山663000
出 处:《云南水力发电》2022年第8期301-304,共4页Yunnan Water Power
摘 要:砂石料是水利水电建设工程的主要建筑材料,其单价对工程的造价和效益有直接影响。从人工砂石料单价的计算方法入手阐述了工序单价法的编制过程,并以鱼塘水库为例总结合理的砂石料单价编制和计算方法。合理编制砂石料单价对整个工程造价的确定和控制起到至关重要的作用。Sandstone material is the main building material for hydraulic and Hydropower projects,and its unit price has a direct impact on the cost and benefit of the project.In this paper,the compilation process of process unit price method is elaborated from the calculation method of unit price of artificial aggregate.Taking the Yutang Reservoir as an example,this paper summarizes the reasonable preparation and calculation method of unit price of sandstone material.Reasonable preparation of unit price of sand and stone material plays a vital role in determining and controlling the cost of the whole project.
分 类 号:TU723.3[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222