检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:甘巨强 GANG Ju-qiang(Huaneng Lancang River International Energy Inc.,Kunming 650051,China)
机构地区:[1]华能澜沧江国际能源有限公司,云南昆明650051
出 处:《云南水力发电》2022年第8期319-322,共4页Yunnan Water Power
摘 要:随着我国水利水电行业在现代社会中的发展,水利水电工程建设逐渐成为现阶段社会重要能源开发利用工作。工程建设离不开施工组织设计的指导和工程造价的管理,那么就要在水利水电工程建设中明确两者的关系,从而提高水利水电工程的经济利益。文章阐述了施工组织设计和工程造价之间的关系,分析了施工组织设计对工程造价的影响,最后提出了优化水利水电工程造价的措施,旨在促进水利水电工程的经济发展。With the development of China's water and hydropower industry in modern society,the construction of water conservancy and hydropower engineering has gradually become an important energy development and utilization work in society at this stage.Engineering construction is inseparable from the guidance of construction organization design and the management of engineering cost.Therefore,it is necessary to clarify the relationship between the two in the construction of hydraulic and Hydropower projects,so as to improve the economic benefits of hydraulic and Hydropower projects.This paper elaborates the relationship between construction organization design and construction cost,analyses the impact of construction organization design on construction cost,and finally puts forward measures to optimize construction cost of water and hydropower projects in order to promote economic development of water and Hydropower projects.
分 类 号:TV512[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.79