基于邻接矩阵法的变电站系统抗震可靠性分析  被引量:2

Seismic reliability analysis of substation system based on adjacency matrix

在线阅读下载全文

作  者:刘晓航 郑山锁[1,2] 黄瑜 董淑卿 杨丰 董晋琦 LIU Xiao-hang;ZHENG Shan-suo;HUANG Yu;DONG Shu-qing;YANG Feng;DONG Jin-qi(School of Civil Engineering,Xi’an University of Architecture and Technology,Xi’an 710055,China;Key Lab of Structural Engineering and Earthquake Resistance,Ministry of Education,Xi’an University of Architecture and Technology,Xi’an 710055,China;Shaanxi Electric Power Design Institute Co.Ltd,Xi’an 710055,China;China Qiyuan Engineering Corporation,Xi’an 710055,China)

机构地区:[1]西安建筑科技大学土木工程学院,陕西西安710055 [2]西安建筑科技大学结构工程与抗震教育部重点实验室,陕西西安710055 [3]陕西省电力设计院有限公司,陕西西安710055 [4]中国启源工程设计研究院有限公司,陕西西安710055

出  处:《浙江大学学报(工学版)》2022年第8期1495-1503,共9页Journal of Zhejiang University:Engineering Science

基  金:国家重点研发计划资助项目(2019YFC1509302);陕西省重点研发计划资助项目(2021ZDLSF06-10);西安市科技计划资助项目(2019113813CXSF016SF026)。

摘  要:针对变电站系统后评估过程中的计算效率问题,提出基于邻接矩阵的可靠性评估流程用以分析变电站系统.邻接矩阵所建立的边权模型能够直观地反映系统单元和设备间的逻辑关系,拟Warshall算法通过对邻接矩阵元素的布尔运算高效求解连通性矩阵,从而以Quasi-Monte Carlo模拟方法计算出整个系统的功能状态.基于此评估流程研究了一个典型的6进线10出线220/110/10 kV变电站,计算其抗震可靠性并确定了抗震关键设备.案例分析结果表明,基于邻接矩阵的系统评估思路是可行的,220 kV的电压互感器、断路器、隔离开关及110 kV的隔离开关被评定为变电站系统中最关键的功能设备,提高它们的抗震性能可以显著提高整个变电站系统的抗震可靠性.A reliability evaluation process based on adjacency matrix was proposed to analyze substation system,aiming at the problem of computational efficiency in the post evaluation of substation system.The edge weight model established by the adjacency matrix can intuitively reflect the logical relationship between the system units and the equipment.The quasi-Warshall algorithm efficiently solves the connectivity matrix by Boolean operations on the adjacency matrix elements,thereby calculating the functional status of the entire system by the Quasi-Monte Carlo simulation method.A typical 220/110/10 kV substation with 6 incoming lines and 10 outgoing lines was studied based on this evaluation process.Its seismic reliability was calculated and the key seismic equipment was determined.The case analysis results showed that the system evaluation idea based on adjacency matrix was feasible.220 kV voltage transformers,circuit breakers,isolating switches and 110 kV isolating switches were assessed as the most critical functional equipment in the substation system.Improving their seismic performance can significantly improve the seismic reliability of the entire substation system.

关 键 词:拟蒙特卡洛模拟 变电站系统 基本网络模型 抗震可靠性 关键设备识别 

分 类 号:P315.9[天文地球—地震学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象