检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:龚国军 GONG Guo-jun(Yiyang Housing Security Service Center,Yiyang 413000,China)
出 处:《价值工程》2022年第25期32-34,共3页Value Engineering
摘 要:在市场经济繁荣发展的背景下,建筑行业的发展越来越快,建设工程项目所面临的管理压力也随着增加,在保证建设工程项目质量的同时还需要做到减少建设周期、节约建设成本。在这样的条件下,建设工程项目的质量管理就是建设项目实施的关键,本文以益阳“一园两中心”PPP项目为例分析建设工程项目在工程质量管理中存在的问题,并根据相关问题提出相应的解决策略。Under the background of the prosperity and development of the market economy,the development of the construction industry is getting faster and faster,and the management pressure of the construction projects is also increasing.While ensuring the quality of the construction projects,it is also necessary to reduce the construction cycle and save the construction costs.Under such conditions,the project quality management of the construction project is the key to the construction project.This paper takes the Yiyang"one park and two centers"PPP project as an example to analyze the problems existing in the project quality management of the construction project,and puts forward the corresponding solution strategies according to the problem.
分 类 号:TU712[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28