检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘江云 LIU Jiangyun(School of Managenent,Wuhan College,Wuhan 430212,Hubei,China)
出 处:《工程建设》2022年第7期11-16,共6页Engineering Construction
摘 要:商业建筑和体育场馆类建筑因其使用场景的特殊要求,对其大跨度穹顶拉索的振动控制要求极高。为研究大跨度拉索在强迫荷载作用下的半主动控制效果,本文利用MR阻尼器构建一套可实现的半主动控制系统,并基于MATLAB环境搭建控制平台,模拟实际工程中的白噪声荷载,研究拉索体系在该荷载作用下的强迫振动。研究表明:MR阻尼器对于白噪声荷载作用下的拉索振动有较好的控制效果,且中点处的减振效果优于被动控制,可运用于大跨度拉索的减振。Due to the special requirements of usage scenarios, the commercial buildings and stadiums have extremely high vibration control requirements to their long-span dome lasso.In order to study the effect of semi-active control of large-span lasso under forced load, a set of achievable semi-active control system is constructed by using MR dampers and a control platform is built based on MATLAB environment to simulate the white noise load in actual engineering and to study the forced vibration of the lasso system under this load.The research shows that MR dampers have better control effect on the vibration of lasso under the action of white noise load, and the damping effect at the midpoint is better than the passive control, which can be applied to the damping of large span lasso.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.200